Installation of Polymer Injection Skid on Water Injection Well SB-492
Year – 2019
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project scope consist of Earth works, Fabrication and Installation of Wellhead piping, Installation of Polymer skid and Electrical and Instrumentation works.
Fire Alarm System Control Panel (FACP) Replacement at Al Ain Station (AAS), Jebel Ali Station (JRS) and Umm Al Naar receiving station (URS) Project.
Year – 2019
Client – Dolphin Energy
Our Role – Main Contractor
Scope of Work – The project scope consists of replacement of Fire Alarm System Control Panel (FACP) and associated F&G field devices in Jebel Ali Station (JRS), Al Ain Station and Umm Al Naar Station (URS).
Inspection and Rectification of Piping misalignment for ASAB-2 Acid Gas Aftercoolers 153-E-101-6 A/B/S
Year – 2018
Client – ADNOC Gas Processing
Our Role – Main Contractor
Scope of Work – Contractor scope consists of Rectification of piping misalignment for Acid Gas Coolers at ASAB -2 153-E-101, 102, 103, 104 & 106 A/B/S during the Shutdown period.
Protection of Vulnerable Pipeline Sections of AFP and TFP Procurement & Construction Works.
Year -2018
Client – Dolphin Energy Limited
Our Role – Main Contractor
Scope of Work – Contractor scope consists of Construction Engineering, Procurement & Construction works for Repair and Modification of the Berms, Covers including additional protective boulders, Maintenance Roads, and Slope stability for vulnerable Pipeline sections for the Al Ain-Fujairah Pipeline and Taweela-Fujairah Pipelines.
EPC Works for TFP/AFP Interconnection Meters.
Year -2014
Client – Dolphin Energy Limited
Our Role – Main Contractor
Scope of Work – EPC works including Installation of Metering Skid and ROV, Supply and Installation of Active Cooled Shelter, LV Switchgear, UPS, F&G Panel, RTU / SCADA Modification and associated Civil, Structural and E& I works for the TFP / AFP INTERCONNECTION METERS at FRS and BV-06.
Supply and Installation of Pressure Reduction Skid and Pipeline Tie-in.
Year -2014
Client – Noble Steel Industries LLC
Our Role – Main Contractor
Scope of Work – Scope of Works involves Supply and Installation of Pressure Reducing Skid and Tie-in from GASCO facility, Piping Construction Works and Commissioning.
Construction of Concrete Well Cellar and Mud Waste Pits.
Year -2014
Client – ADCO
Our Role – Main Contractor
Scope of Work –
- Scope of works involves performing the following services on call basis for 3 years at both onshore and offshore locations:
- Construction of Concrete Well Cellar.
- Construction of Concrete Mud Pit.
- Breakings of Concrete Slab to accommodate well cellar and / or waste pit in existing clusters.