EPC for Miscellaneous Works at TPO
Year – 2023
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – Engineering, Procurement, and Construction of 2 number of power skids at Jebel Dhana including modification of various switch gears, Additional Isolation Valves on Inlet and Outlet connections to small and medium tanks including RGA lightning system for tanks. Also, implementation of Environmental Impact Assessment (EIA) study Recommendations for ADCOP line Block valve stations, IPS and MOT.
EPC Works for Additional Air Coolers
Year – 2023
Client – ADNOC Sour Gas
Our Role – EPC Contractor
Scope of Work – Installation of Refrigerant Condensers (0730-E-203A/B) 5 No’s each (Total 10 Bays) and Installation of Refrigerant Condensers (0741-E/0742-E-201) 1 No each (Total 2 Bays). All associated Piping and Tie-in Works, Civil works, Electrical Works, Instrumentation and Control works, NDT Works, Pre-commissioning and start-up.
EPC for New Flow Suction Tank, Access Platforms, Dead Leg Repair Works and Sewage Treatment Plant in Bu Hasa.
Year – 2022
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of four packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for:
- PACKAGE 1: Access Platforms and Walkways at Bu Hasa CDS & RDS 2.
- PACKAGE 2: Piping Dead Leg Repairing Works.
- PACKAGE 3: New Sewage Treatment Plant in Bu Hasa.
- PACKAGE 4: New FST Tank in Bu Hasa CDS.
EPC works for Additional MPSVs
Year – 2022
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – EPC works for the provision of 4 No’s of Multiport Selector Valves (MPSV), 2 No’s of MPFM with ESD and field instruments. All associated Piping and Tie-in Works, Civil works, Electrical Works, Instrumentation and Control works, NDT Works, Pre-commissioning and Painting Works.
Supply of Resources for Well work over preparation & Tie-in activities for ADNOC Onshore Assets
Year – 2022
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope includes the supply of resources to perform dismantling and re-instatement (Tie-In) of Well Head Facilities like piping & associated surface facilities up to 100 – 120 meters for Oil, Water, Gas wells, WAG/GLFT/ESP wells from Well Head X-mas trees for all ADNOC Onshore Assets (BAB, Bu Hasa, Asab, Sahil, SQM)
EPC for BAB Facilities Upgrade Project
Year – 2022
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of four packages including Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for:
1. PACKAGE 1: BCDS Flow lines Decongestion
2. PACKAGE 2: BAB SIMGAP EOR Pilot Project
3. PACKAGE 3: BAB TH (B) Gas injection system Holistic
4. PACKAGE 4: EPC for 4 Additional Artificial Lift Wells
EPC for Al Dabbiya (Al Nouf) Thamama B Transition Zone Developments-Phase II
Year – 2021
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 2 new clusters including 1 no of Offshore cluster, Works at the existing cluster, Tie-in of 33 wells, 35 Km of pipeline Construction Works and associated Civil, Electrical, Instrumentation works at Al Nouf.
EPC for AIG Mirfa Train Interconnection Project.
Year – 2021
Client – ADNOC Linde Industrial Gases
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Supply, Fabrication, Installation, Inspection, Testing and Pre – Commissioning of new Interconnecting Piping and MOV’s between Train 1 & 2.
Technical Services Agreement (Call-Off) for Bu Hasa Tie-Ins (2021-25) Package 2
Year – 2021
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 104 no’s of various type of Wells at On Pad/Off Pad and 153 KM of Flowline Construction Works (U/G and A/G) at Bu Hasa.
Construction of Flowlines and Wellhead Tie-in installations for conventional wells at ADNOC Onshore Fields-Package B (BAB)
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of Flowlines and Wellhead installations across the ADNOC Onshore Oil Field at BAB (152 No’s of Oil Producer Wells, 138 No’s of Water Injection Wells and 2,092 Km flow lines)
EPC for Fire Water Ring Replacement at MOT & MPS
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of above ground fire water pipe with internal FBE coating, concrete foundations, Structural installation, Soil improvements at foundation locations, demolition & removal of existing underground GRE pipe and associated Electrical and Instrumentation works.
EPC for Upgrade of MP-21
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 2 no’s of Fire Water Storage Tanks, Fire Water pumps, Jockey pumps, Diesel Tank, MOV’s GRE piping and associated Electrical and Instrumentation works.
EPC Tie-ins for 17 Wells Package B in ADNOC Onshore’s BAB Integrated Facilities Project (BIFP)
Year – 2020
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consists of Procurement and Construction of 17 No’s of wells at BAB (12 No’s Oil Producer Wells and 5 No’s of Water Injection Wells)
Call-Out Works Contract for ASR GAS Tie-Ins in BAB
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 09 No’s of wells at BAB (6 No’s for Gas Producer Wells, 3 No’s of Gas Injector Wells and re-routing of 20 no’s of Flowline)
BAB Regenerator 13-C-102 Upgrade and Replacement
Year – 2020
Client – ADNOC Gas Processing
Our Role – EPC Contractor
Scope of Work – The project scope consists of Demolition of existing column, Transportation, construction of new foundation for column, Installation of Column and foam skid.
EPC for Fire water Network Upgrade – ASAB 0
Year – 2019
Client – ADNOC Gas Processing
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of Fire Water Storage Tank, Clean Agent System, Hypochlorite injection system, GRE piping and Installation of Fire Hydrants.
EPC Tie-ins for 17 Wells in ADNOC Onshore’s BAB Integrated Facilities Project (BIFP)
Year – 2019
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 17 No’s of wells at BAB (13 No’s Oil Producer Wells, 2 No’s of Water Injection Well and 2 No’s of WAG Well)
Engineering, Procurement and Construction for Widening of CICPA (2) Gates & Road in Bab-Habshan Field.
Year – 2019
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consist of Widening of existing Asphalt road, Construction of structural shelter for CICPA check point, Installation of caravans, Installation of Scanner and Installation of Substation.
EPC for Miscellaneous Modifications for FOUR Packages at BAB
Year – 2019
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project scope consists of four packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for:
- EPC for Installation of Chemical Injection Skids at High Water cut oil wellheads in BAB (17 Nos’s)
- EPC for Provision of Spare BCDS Tank Flare Knock Out Drum (2 Pumps and 1 Vessel)
- BAB CDS Upgrade of Trains 1 to 5 Stripper Pumps (10 Pumps)
- EPC for replacement of Al Mirfa Potable Water line production (16”- 16 Km, Pipeline)
Pre-Works and Pipeline Works at Bu Hasa Integrated Field Development (BUIFD) Project
Year – 2018
Client – ADNOC Onshore / TECNICAS REUNIDAS S.A
Our Role – Sub Contractor
Project Scope Includes – Pre-Works And Main Pipeline construction works for approx. 811 Kms of Pipelines/ Flowlines of various diameters 24”/20”/18”/16”/12”/10”/8”/6”/4”/3” including Construction of 5 nos. of Block Valve stations.
Pre-Works Includes: De-Oiling, flushing, Re-routing & demolition of existing A/G Oil Flowlines & Water Injection lines / Under Ground Gas Injection Flowlines and Tie-ins and Relocation of existing Solar/WHCP panels, Rerouting of existing OFC/Sand tracks/Rig Roads.
Main Pipeline Works Includes: ROW construction, A/G and U/G Pipeline Construction Horizontal Directional Drilling Crossings (NDRC), Open Cut Crossings, Hydro Testing for Pipelines, Pre-commissioning Works including Cleaning, Gauging, Flushing, Swabbing, Drying, Caliper Pigging and Intelligent Pigging. FOC laying, Cathodic Protection (CP) Works.
EPC for BATCH-IV (PMRFS), Cluster looping and Huwaila Surface Facilities
Year – 2018
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – Contractor scope consists of Engineering, Procurement, Construction, Pre-commissioning and Commissioning work for the following package:
- BATCH IV PMRF’S at Bu Hasa field
- Miscellaneous Civil works at Bu Hasa gas plant, RDS’s and CDS
- EPC Services for Installation of one new MSM and MPFM in Huwaila field
- EPC Services for Bu Hasa WIC looping project
- EPC work for replacement of Bu Hasa flare ignition system at CDS, RDS’s and NGIP
Tie-Ins of Batch II Wells at NEB Fields
Year – 2018
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – EPC Scope of Work includes;
The project includes Engineering, Procurement, Construction, Pre-commissioning and Commissioning of following Wells.
- Tie in of 30 Nos of OP and WAG Wells in Onshore and Offshore multiple Clusters at Dabbiya.
- Tie in of 10 Nos of OP and WI wells in Rumaitha Field at multiple Clusters.
- 4” dia carbon steel underground water injection pipeline approx. 4KM at Rumaitha.
Rumaitha North CO2 Project Expansion (WAG)
Year – 2018
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project includes Residual Engineering, Procurement, Construction, Pre-commissioning and Commissioning work for 4 Nos Wells i.e. WAG (CO2) Wells, Oil Producer Wells, Water Disposal Wells and integration of these Wells to existing CLS N facilities. Supply and construction of new 8” CS Underground Pipeline approx. 3.7 Km from CLS-N to Rumaitha CPP.
Construction of Flowlines and Wellhead Tie-In Installations in ADCO’s Fields – Package A
Year – 2017
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for 90 Nos Natural Flowing Oil Wellheads, 38 Nos Water Injection Wellheads and 360 km of flowlines.
Construction of Flowlines and Wellhead Tie-In Installations in ADCO’s Fields – Package C
Year – 2017
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for 118 Nos Natural Flowing Oil Wellheads, 77 Nos Water Injection Wellheads, 420 Km of Flowline and 40 Nos Replacement of Wellhead Control Panels.
Construction Works for Tie-in of Nine (9) Wells Affiliated with Bab Habshan-1 Development Project (Phase-II)
Year – 2017
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project includes Residual Engineering, Procurement, Construction, Pre-commissioning and Commissioning work for 4 Nos Oil Producer Wells, 5 Nos Water Injection Wells and 60 km of various size flowlines section and Painting Works.
EPC for High Pressure Connection to NGV Filling Stations (Phase 2A)
Year – 2016
Client – GASCO
Our Role – Main Contractor
Scope of Work – EPC Scope of Work includes
- High Pressure Pipe Connections to Main gas pipe line (Hot Tap, Mechanical Tie-in) and installation of Pig traps & Hot Tap valve.
- AGI (Above Ground Installations) consisting of Pig Trap, ROV, Filtration, H2S Scrubbers with H2S online analyzer, Water dew point analyzer, Pressure Regulation, Custody Transfer Metering and Odorizing and associated Piping, Mechanical, Civil and E&I works.
- All associated Piping and Tie-in Works, Civil works, Electrical Works, Instrumentation and Control works, NDT Works, Pre-commissioning, Cathodic Protection and Painting Works.
EPC for Filtration, Metering And FCV Skids At Mirfa CRS.
Year – 2015
Client – GASCO
Our Role – Main Contractor
Scope of Work – EPC works for provision of New Filters (1 Working + 1 Stand-by), Metering Skid with Flow Meter, FCV Skid, and Active Cooled Shelter with UPS System. All associated Piping and Tie-in Works, Civil works, Electrical Works, Instrumentation and Control works, NDT Works, Pre-commissioning and Painting Works.
Call-Out works Contract for ASR Gas Facilities in Bab (Package “A”)
Year – 2015
Client – ADCO
Our Role – Main Contractor
Scope of Work – EPC (Engineering, Procurement and Construction) works for BAB Producer (18 nos.) and Injector (8 nos.) wellheads, approximate 95 Kms of 8” and 6” flowlines, Work over of Gas Producer (9 nos.) well head, modification of existing flowlines and trunklines. All associated Piping and Tie-in Works, Civil works, Electrical Works, Instrumentation and Control works, NDT Works, Pre-commissioning, Cathodic Protection and Painting Works.
Al Dabbiya Surface Facilities Phase III Project – Onshore Pipeline Works.
Year – 2015
Client – ADCO / TECNIMONT
Our Role – Sub Contractor
Scope of Work – Pipeline Construction works for approx. 270 kms of Onshore Pipelines of various diameters 28”/24”/20”/16”/12”/10”/8”/6”/4” including Construction of 7 nos. of Block Valve stations, 60 nos. Pig Launcher/Receiver stations inside the Onshore and Offshore Clusters, approx 8 Kms of Horizontal Directional Drilling Crossings, Hydro Testing for entire Pipeline Network including Onshore and Offshore sections, Pre commissioning Works including Cleaning, Gauging, Flushing, Swabbing, Drying, Calliper Pigging, Preservation and Intelligent Pigging, All associated E&I Works, Cathodic Protection (CP) Works and Decommissioning/De-Oiling of existing pipelines.
Rumaitha/ Shanayel Phase III Project.
Year – 2015
Client – ADCO/GS E&C
Our Role – Sub Contractor
Scope of Work – SMP (Structural, Mechanical and Piping) Works, Package B including:
- Structural erection and alignment works.
- Mechanical Equipment Erection & alignment works.
- Piping (CS, SS, Alloy steel, Non Ferrous, Cladded, GRE) welding, Valve & support installation including all NDT services.
- Painting and Insulation Works In Progress
EPC for Batch II PMRF’s – Buhasa.
Year – 2015
Client – ADCO
Our Role – Main Contractor
Scope of Work – EPC Services for Batch -II PMRFs as listed below:
- Installation of Motorized Actuated valves at Booster and MOL pump Recycle Line.
- Facilities for the collection and Recovery of spent Lube Oil/Crude Oil at CDS.
- Installation of Gas Detector system & ESD valves at Gas Injection Line for 44 Gas Wells.
- Connection for Gas Lifts Flare System to Train 1 Flare Header.
Engineering, Procurement and Construction (EPC) for Additional NGV Filling Stations.
Year – 2014
Client – ADNOC Distribution
Our Role – Main Contractor
Scope of Work – It covers Engineering, Procurement, and Construction of 14 nos. NGV stations and all associated Civil, Mechanical, Piping and E&I work.
ADCO Tank Farm Facilities modification and Concrete pit construction works.
Year – 2014
Client – ADCO
Our Role – Main Contractor
Scope of Work – EPC works including Civil, Mechanical and Piping modification / up gradation of Tank Farm Facilities (Fire water Tanks, Foam Skids, Fire Monitors, Chemical Sheds, other small tanks etc) and Construction of Concrete pits at ADCO – Jebel Dhana location.
Flow lines replacement works.
Year – 2014
Client – ADCO
Our Role – Main Contractor
Scope of Work – Provision of welding and pipeline maintenance services for replacement of 4″ (API 5L Gr. B), 6″ (API 5L X65 & Gr. B) and 8″ (API 5L Gr. B) flow lines for three years in ADCO fields including ROW preparation, welding, NDT, coating, Cathodic protection, pipe laying, crossings including HDD, Hydro testing, pigging, removal of redundant flow lines etc.
Inter Refineries Pipelines (IRP II) Project -Phase II
Year – 2013 -2014
Client -Takreer/ GS E&C
Our Role – Sub Contractor
Scope of Work – Pipeline Construction of 220 kms of 28″ (API 5L – X70), 320 kms of 12″ (API 5L – X65) and 83 kms of 10″ API 5L X60) Pipeline, 139 No’s of HDD Crossings, 470 No’s of minor crossing. Construction of 9 No’s of SV stations and 3 No’s of Pipeline (Receiver/Launcher) facilities including Civil, Mechanical, E&I works of total 900 Km of OFC / SDH Cable laid for the CCTV and Communication network along with Installation of 250 CCTV camera and 250 Solar panels.
Inter Refineries Pipelines (IRP II) Project -Phase I
Year – 2013-2014
Client -Takreer/ GS E&C /KSS
Our Role – Sub Contractor
Scope of Work – Pipeline construction of 30 kms of 20” (API 5L – X65) and 40 kms of 10″/8” (API 5L – X60), 116 No’s of HDD Crossings, 230 No’s of Minor Crossings. Construction of 1 No’s of SV station and 6 No’s of Pipeline (Receiver/Launcher) facilities including Civil, Mechanical, E&I works of total 150 kms of OFC / SDH Cable laid for the CCTV and Communication network including Installation of 55 No Solar Panel and 55 No CCTV cameras.
Main Contractor High pressure pipeline connection to NGV filling stations phase II
Year – 2013
Client -GASCO
Our Role – Main Contractor
Scope of Work – EPC project for supply of gas from existing GASCO pipeline for 4 no’s of ADNOC petrol stations to be converted into CNG filling stations.
Construction of Cathodic Protection for Well Casings for newly Drilled Wells (2010-2012) in ADCO Fields.
Year -2011-2013
Client – ADCO / BSS Technologies
Our Role – Sub Contractor
Scope of Work – Civil / Installation & Construction works for Cathodic Protection for Well Casings.
Construction of 20″ Gas Pipeline from GASCO to Fertil – 2.
Year – 2012
Client – NPCC / FERTIL
Our Role – Main Contractor
Scope of Work – Construction of 20″ Gas Pipeline from GASCO to Fertil – 2 including 3 Nos of Hot Taps, Launcher Station Including Installation of Gas Cyclone Filters, Pressure Reduction Skid, Metering Skid, Gas Filters, Pig Launcher with associated piping works & Control room Building. Construction of Receiver Station including installation of Pig Receiver ROV’s, MOV’s & associated piping.
Pipeline Rehabilitation programme 2012 – 2013
Year – 2012
Client -Dolphin Energy Ltd
Our Role – Main Contractor
Scope of Work – Excavation, dewatering and Surface preparation for application of protective coating (STOPAQ) for 6km of 30″ Maqta Al Ain pipeline at various locations.
Habshan 5 Utilities & Off sites Project – Tie-ins at Habshan 0, 2, 3, 4, and BAB CDS
Year – 2011-2012
Client -GASCO / Hyundai
Our Role – Sub Contractor
Scope of Work – Construction of 65 No’s of Tie-ins of Dia ranging from 2’’ to 36’’ in Habshan Plant.
EPC for Replacement of Amine Filtration Package at Units 30 and 31 (Habshan & BAB)
Year – 2011-2012
Client -GASCO
Our Role -Main Contractor
Scope of Work – SOW includes dismantling of existing skid at unit 30 & 31 and Design / Engineering, Procurement and Construction of new Amine Filtration Units 30 and 31 with associated Civil, Mechanical, Electrical, Instrumentation and procurement of Filters consumables, Internals.
NGD 37 – Construction Works for NGV Filling Stations in Abu Dhabi & Sharjah.
Year – 2009 – 2010
Client -GASCO
Our Role -Main Contractor
Scope of Work – Converting 17 No’s of Existing Fuel Stations, including Heavy Foundations, Electrical Power Supply Arrangements / Substations, CNG Branding and New Image Canopies.
Removal of 16” Maqta – Baniyas Pipeline & Removal of ADCO’s Jarn Yaphour – Umm Al Nar 18″ Transfer Line.
Year – 2009 – 2010
Client -GASCO
Our Role -Main Contractor
Scope of Work – Demolition of GASCO’s 18km long 16” dia Pipeline including Corridor Fence, Valve Stations, Pig Traps, Control Room & ADCO’s 32km long 18″ dia Pipeline including Valve Stations.
Natural Gas Distribution Network – NGD 07
Year – 2008 – 2010
Client – Gasco / QEnergy
Our Role -Sub Contractor
Scope of Work – Installation of Pipelines, Hot Taps and Pressure Reduction Station facilities for 7 nos. of ADNOC CNG Stations in Abu Dhabi and Al Ain inclusive of civil, building, mechanical, electrical and instrumentation scope.
Natural Gas Transmission and Distribution Supply to Yas Island, Abu Dhabi.
Year – 2008 – 2010
Client – Al Dar / Gasco / QEnergy
Our Role -Sub Contractor
Scope of Work – Installation of 8kms long Gas Pipeline (24″, 16″ & 12) including hot tap, Highway and Canal Crossing, Launcher, Receiver Stations, Primary and Secondary Pressure Reduction Stations and arranging Temporary Gas Supply by 10″ PE Pipeline.