EPC for Al Dabbiya (Al Nouf) Thamama B Transition Zone Developments-Phase II
Year – 2021
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 2 new clusters including 1 no of Offshore cluster, Works at the existing cluster, Tie-in of 33 wells, 35 Km of pipeline Construction Works and associated Civil, Electrical, Instrumentation works at Al Nouf.
EPC for AIG Mirfa Train Interconnection Project
Year – 2021
Client – ADNOC Onshore
Our Role – ADNOC Linde Industrial Gases
Scope of Work – The project scope consists of Engineering, Supply, Fabrication, Installation, Inspection, Testing and Pre-Commissioning of new Interconnecting Piping and MOV’s between Train 1 & 2.
Technical Services Agreement (Call-Off) for Bu Hasa Tie-Ins (2021-25) Package 2
Year – 2021
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 104 no’s of various type of Wells at On Pad/Off Pad and 153 KM of Flowline Construction Works (U/G and A/G) at Bu Hasa.
Construction of Flowlines and Wellhead Tie-in installations for conventional wells at ADNOC Onshore Fields-Package B (BAB)
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of Flowlines and Wellhead installations across the ADNOC Onshore Oil Field at BAB (152 No’s of Oil Producer Wells, 138 No’s of Water Injection Wells and 2,092 Km flow lines)
EPC for Fire Water Ring Replacement at MOT & MPS
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of above ground fire water pipe with internal FBE coating, concrete foundations, Structural installation, Soil improvements at foundation locations, demolition & removal of existing underground GRE pipe and associated Electrical and Instrumentation works.
EPC for Upgrade of MP-21
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 2 no’s of Fire Water Storage Tanks, Fire Water pumps, Jockey pumps, Diesel Tank, MOV’s GRE piping and associated Electrical and Instrumentation works.
EPC Tie-ins for 17 Wells Package B in ADNOC Onshore’s BAB Integrated Facilities Project (BIFP)
Year – 2020
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consists of Procurement and Construction of 17 No’s of wells at BAB (12 No’s Oil Producer Wells and 5 No’s of Water Injection Wells)
Call-Out Works Contract for ASR GAS Tie-Ins in BAB
Year – 2020
Client – ADNOC Onshore
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 09 No’s of wells at BAB (6 No’s for Gas Producer Wells, 3 No’s of Gas Injector Wells and re-routing of 20 no’s of Flowline)
EPC for Fire Water Network Upgrade – ASAB 0
Year – 2019
Client – ADNOC Gas Processing
Our Role – EPC Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of Fire Water Storage Tank, Clean Agent System, Hypochlorite injection system, GRE piping and Installation of Fire Hydrants.
EPC Tie-ins for 17 Wells in ADNOC Onshore’s BAB Integrated Facilities Project (BIFP)
Year – 2019
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consists of Engineering, Procurement and Construction of 17 No’s of wells at BAB (13 No’s Oil Producer Wells, 2 No’s of Water Injection Well and 2 No’s of WAG Well)
Engineering, Procurement and Construction for Widening of CICPA (2) Gates & Road in Bab-Habshan Field.
Year – 2019
Client – ADNOC Onshore/CPECC
Our Role – Sub Contractor
Scope of Work – The project scope consist of Widening of existing Asphalt road, Construction of structural shelter for CICPA check point, Installation of caravans, Installation of Scanner and Installation of Substation.
EPC for Miscellaneous Modifications for FOUR Packages at BAB
Year – 2019
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project scope consists of four packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for:
- EPC for Installation of Chemical Injection Skids at High Water cut oil wellheads in BAB (17 Nos’s)
- EPC for Provision of Spare BCDS Tank Flare Knock Out Drum (2 Pumps and 1 Vessel)
- BAB CDS Upgrade of Trains 1 to 5 Stripper Pumps (10 Pumps)
- EPC for replacement of Al Mirfa Potable Water line production (16”- 16 Km, Pipeline)
Pre-Works and Pipeline Works at Bu Hasa Integrated Field Development (BUIFD) Project
Year – 2018
Client – ADNOC Onshore / TECNICAS REUNIDAS S.A
Our Role – Sub Contractor
Project Scope Includes – Pre-Works And Main Pipeline construction works for approx. 811 Kms of Pipelines/ Flowlines of various diameters 24”/20”/18”/16”/12”/10”/8”/6”/4”/3” including Construction of 5 nos. of Block Valve stations.
Pre-Works Includes: De-Oiling, flushing, Re-routing & demolition of existing A/G Oil Flowlines & Water Injection lines / Under Ground Gas Injection Flowlines and Tie-ins and Relocation of existing Solar/WHCP panels, Rerouting of existing OFC/Sand tracks/Rig Roads.
Main Pipeline Works Includes: ROW construction, A/G and U/G Pipeline Construction Horizontal Directional Drilling Crossings (NDRC), Open Cut Crossings, Hydro Testing for Pipelines, Pre-commissioning Works including Cleaning, Gauging, Flushing, Swabbing, Drying, Caliper Pigging and Intelligent Pigging. FOC laying, Cathodic Protection (CP) Works.
EPC for BATCH-IV (PMRFS), Cluster looping and Huwaila Surface Facilities
Year – 2018
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – Contractor scope consists of Engineering, Procurement, Construction, Pre-commissioning and Commissioning work for the following package:
- BATCH IV PMRF’S at Bu Hasa field
- Miscellaneous Civil works at Bu Hasa gas plant, RDS’s and CDS
- EPC Services for Installation of one new MSM and MPFM in Huwaila field
- EPC Services for Bu Hasa WIC looping project
- EPC work for replacement of Bu Hasa flare ignition system at CDS, RDS’s and NGIP
Tie-Ins of Batch II Wells at NEB Fields
Year – 2018
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – EPC Scope of Work includes;
- The project includes Engineering, Procurement, Construction, Pre-commissioning and Commissioning of following Wells.
- Tie in of 30 Nos of OP and WAG Wells in Onshore and Offshore multiple Clusters at Dabbiya.
- Tie in of 10 Nos of OP and WI wells in Rumaitha Field at multiple Clusters.
- 4” dia carbon steel underground water injection pipeline approx. 4KM at Rumaitha.
Construction of Flowlines and Wellhead Tie-In Installations in ADCO’s Fields – Package A
Year – 2017
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for 90 Nos Natural Flowing Oil Wellheads, 38 Nos Water Injection Wellheads and 360 km of flowlines.
Construction of Flowlines and Wellhead Tie-In Installations in ADCO’s Fields – Package C
Year – 2017
Client – ADNOC Onshore
Our Role – Main Contractor
Scope of Work – The project packages include Engineering, Procurement, Construction, Pre-commissioning and Commissioning works for 118 Nos Natural Flowing Oil Wellheads, 77 Nos Water Injection Wellheads, 420 Km of Flowline and 40 Nos Replacement of Wellhead Control Panels.