Split Tee Welding – IRP-II project
Year – 2014
Client – Takreer / GS Engineering
Our Role – Sub Contractor
Scope of Work –
- 1 No’s of 16” x 10” Split Tee welding works at SV4 station in Tariff.
- SOW: Installation
Split Tee Welding – Natural Gas Supply to Arkan Cement Factory
Year – 2012
Client – DEL / GASCO / NPCC / CAT
Our Role – Sub Contractor
Scope of Work –
- 1 No’s of 30″ x 20″ Split Tee Hot Tap for Sales Gas Arkan Cement Factory
- SOW: Installation.
Construction of 20″ gas Pipeline from Gasco CRS-704 to Fertil -2
Year – 2012
Client – NPCC / GASCO
Our Role – Sub Contractor
Scope of Work –
- 3 No’s of 42″ X 16″, 30″ X 16″ and 14″ X 10″ Hot Taps at Gasco Network in Ruwais.
- SOW: Supply & Installation.
Split Tee Welding – EPC for Supply of Sales Gas to Masdar Shams 1
Year – 2012
Client – GASCO / ALSA
Our Role – Sub Contractor
Scope of Work –
- 1 No’s of 12″ x 10″ Split Tee Hot Tap for Sales Gas to Masdar Shams 1 at Madina Zayed
- SOW: Installation.
Habshan 5 Utilities & Off sites Project
Year – 2011
Client – GASCO / Hyundai
Our Role – Sub Contractor
Scope of Work –
- 2 No’s of 42″ x 30″ Split Tee Hot Tap for Pipeline # 22 at Habshan IGD
- SOW: Supply & Installation.
To carryout 2″ Hot tapping on existing 8″ Condensate pipeline through service work order
Year – 2011
Client – GASCO
Our Role -Main Contractor
Scope of Work –
- 1 No of 2″ X 8″ Split Tee Hot Tap for Condensate Pipeline
- SOW: Installation
Replacement of 10″ & 16″ Gas Pipeline GASCO – BAB
Year – 2011
Client -GASCO / EMCO
Our Role – Sub Contractor
Scope of Work –
- 6″x4″ Flare Line Split Tee Hot Tap Connection at Bab NGL Centre.
- 4″x2″ Flare Line Split Tee Connection at Bab Compressor Station.
- 30″x10″ Split Tee Connection to existing Header Bab Manifold Area.
- SOW: Supply & Installation.
Bourege 2 Project
Year -2010
Client – GASCO / Technicas Reunidas / Chicago Bridge & Iron Company (CBI)
Our Role – Sub Contractor
Scope of Work –
- 18” x 12” Hot Tap Tee Welding.
- SOW: Supply & Installation.
Natural Gas Distribution Network – NGD 07
Year – 2009
Client – GASCO / Dolphin Energy / QEnergy
Our Role – Sub Contractor
Scope of Work –
- 3 nos. of 3″ Hot Taps on 30″ Maqta – Al Ain Gas Pipeline at Khalifa City in Abu Dhabi and Markhania in Al Ain
- 1 no. of 3″ Hot Tap on 48″ Maqta – Jebel Ali Gas Pipeline at Samha in Abu Dhabi.
- SOW: Supply & Installation.
Natural Gas Distribution Network – NGD 07
Year – 2009
Client – GASCO / QEnergy
Our Role – Sub Contractor
Scope of Work –
- 42″ X 4″ Hot Tap on Habshan – Maqta Gas Pipeline at Musaffah.
- 12″ X 2″ Hot Tap on the branch of Maqta – Al Ain Gas Pipeline.
- SOW: Supply & Installation.
Onshore Gas Development Phase -3
Year – 2009
Client – GASCO / Foster Wheeler / Bechtel / Punj Lloyd
Our Role – Sub Contractor
Scope of Work –
- 16″ X 16″ Hot Tapping and Stopple Plugging works on Buhasa Bab NGL Pipeline at MP21.
- SOW: Installation of Split Tees and Threadolet Fitting for Stoppling.
Fabrication and Welding of Split Sleeve on 16″ Habshan – Ruwais Pipeline & 30″ Bab – Maqta Gas Pipeline
Year -2008
Client – GASCO
Our Role -Main Contractor
Scope of Work –
- 7 nos. of Split Sleeves on 16″ Habshan – Ruwais Condensate Pipeline.
- 1 no. of Split Sleeve on 30″ Bab – Maqta Gas Pipeline.
- SOW: Fabrication & Welding of Split Sleeves.
Natural Gas Extension to Ajmal Steel Factory.
Year – 2008
Client – GASCO / Zones Corp / Ajmal Steel
Our Role – Main Contractor
Scope of Work –
- 10″ X 4″ Split Tee on Gasco Network in ICAD 1.
- SOW: Supply & Installation.
ICAD 2 Natural Gas Pipeline Network
Year – 2008
Client – GASCO / Zones Corp / Al Jaber Energy Services
Our Role – Sub Contractor
Scope of Work –
- 18″ x 18″ Split Tee on Gasco Network near ADIC CRS, Musaffah.
- SOW: Technical Services & Split Tee Welding Works.
Hot Tap & Piping Works inside Buhasa Plant
Year – 2008
Client – GASCO / Flowserve Al Mansouri
Our Role – Sub Contractor
Scope of Work –
- 16″ x 2″ Weldolet on Gas Flare Line inside Gasco Buhasa Plant.
- SOW: Technical Services & Weldolet Welding Works.
High Pressure Natural Gas Pipeline for Emirates Integrated Steel Project
Year – 2008
Client – GASCO / ESI / Toledo
Our Role – Sub Contractor
Scope of Work –
- 42″ X 18″ Hot Tap on Bab-Maqta-Taweelah Gas Pipeline (OGD1).
- 42″ X 18″ Hot Tap on Thamama C – Maqta Gas Pipeline (OGD 1)
- SOW: Supply & Installation.
Natural Gas Connections in ICAD1
Year – 2008
Client – GASCO / Zones Corp / Sergas / Emirates Line Factory / German Emirati Company / Union Copper Rod Factory / Super Cement
Our Role – Sub Contractor
Scope of Work –
- 10″ X 2″ Weldolet on Gasco Network in ICAD 1.
- 18″ X 4″ Split Tee on Gasco Network in ICAD 1 – 2 nos.
- 10″ X 6″ Split Tee on Gasco Network in ICAD 1.
- SOW: Technical Services & Split Tee Welding Works.
Natural Gas Reducing Metering Stations
Year – 2007
Client – GASCO / Zones Corp / Fanoy Gas / Future Pipe Industries / Al Ghurar Iron & Steel
Our Role – Sub Contractor
Scope of Work –
- 18″ X 3″ Weldolet on Gasco Network in ICAD 1.
- 18″ x 6″ Split Tee on Gasco Network in ICAD 1.
- SOW: Technical Services & Split tee Welding Works.
Doha Urban Pipeline Relocation
Year – 2007
Client – Qatar Petroleum / Punj Lloyd
Our Role – Sub Contractor
Scope of Work –
- 12″ x 12″ Hot Tapping and Stopple Plugging on Multi Product Pipeline at Doha.
- 16″ x 12″ Hot Tap Connection on Gas Pipeline.
- SOW: Technical Services.
Onshore Gas Development Phase 3
Year – 2007
Client – GASCO / Bechtel / Punj Lloyd
Our Role – Sub Contractor
Scope of Work –
- 18″X18″ Split Tee on AGD1 Condensate Pipeline at Habshan.
- 16″ X 16″ Hot Tapping and Stopple Plugging Works on Buhasa Bab NGL Pipeline at MP21.
- SOW: Technical Services
4″ Dia Pipeline for Natural Gas Extension to Plot No 21B3 & 22B3 in ICAD 1
Year – 2007
Client – GASCO / Zones Corp / QEnergy / Styropak Plastics / Al Riyadh Plastics
Our Role – Sub Contractor
Scope of Work –
- 18″ x 4″ Split Tee on Gasco Network in ICAD 1
- SOW: Supply & Installation.
EGDS Upgrade for East and West Systems Project
Year – 2007
Client – Dolphin Energy / CCIC
Our Role – Sub Contractor
Scope of Work –
- 30″ x 24″ Hot Tap on Maqta – Al Ain Gas Pipeline
- 24″ x 24″, 24″ x 6″ & 24″ x 2″ Hot Tap on Al Ain – Oman Gas Pipeline.
- 48″ x 12″ Hot Tap on Maqta – Jebel Ali Gas Pipeline.
- 36″ x 30″ Hot Tap on Maqta – Taweelah Gas Pipeline at Maqta Manifold.
- 18″ x 18″ Hot Tap Maqta – Umm Al Nar Gas Pipeline at Maqta Manifold.
- 24″ x 24″ Hot Tap on Maqta ADPS Gas Pipeline at Maqta Manifold.
- 42″ x 42″ Hot Tap on Thamama C – Maqta Gas Pipeline at Maqta Manifold.
- SOW: Technical Services.